Step 2 drill four holes.
How to add downspout to existing gutter.
Place the downspouts in place and secure them with metal screws.
Since work must be done to add your additional larger downspout now would be the best time to switch out to 6 gutters as well.
The first thing you should do is decide where the best place to reconfigure one of your downspouts into a gutter.
Drill a large hole in the center of the space you want the downspout to go then hold the downspout sleeve to the bottom of the gutter centered on the hole and trace around the sleeve.
If you have an elbow measure and add an inch and a half to allow for insertion of the elbow into the downspout.
Step 3 file the edges and apply sealant.
Then use a pair of sheet metal shears or a dremel tool to cut out the rest.
Continue reading below our video of the day.
Don t glue this joint.
Gently insert the downspout adapter and reducer assembly into the pipe protruding from the elbow after slipping the adapter onto the downspout.
Its easy less than 30 minutes and under 30 00 in parts.
In either case set an elbow on the ground propped up where the downspout will end and measure to the top of it.
Measure in 4 inches from the end corner of.
Use elbows as necessary assure that the downspouts are aligned properly.
Place a step ladder under the area you are installing the downspout.
Drill a hole in the bottom of the gutter at the 4 inch mark with a 1 inch hole saw attachment to the drill.
Or trace the sleeve underneathe the gutter drill a hole in each corner of your trace and use shears or a dremel tool to cut.
Watch and learn how and stop.
Gutters over flows add downspout to bring water down from roof faster.
Step 4 secure the sleeve to the gutter.
After you have completed the installation of the gutters and bracket hangers install the downspouts to the system.
How to add a downspout in an existing gutter step 1.
Step 1 find the right location.
5 gutters typically get the 2 3 downspout so be aware that if you add 3 4 downspouts to 5 gutters it will look very odd.
If you need to move the downspout on a gutter you ll need four quarter inch screws some polyurethane sealant a pre fabricated pipe band and a standard raz.