Purpose of hydro high point vents is to expel air during hydro test.
Hydrostatic vents and drains.
On the other hand there are hydro vents and drains which function is to provide proper hydro testing and pipe draining.
Check for proper installation of vents and drains.
Hydro testing required that all air must be expelled and pipe must be completely and absolutely fill with water.
Normally size of test vents and drains shall be.
Drain note 1 note 3 note 1note 3 note 1 note 2 note 2 note 2 or t i on top of pip e pipin g h yd r o test ven ts an d d r a in s typic al lo c ation a p p lic a b l e t o a ll p ip in g s u b je c t t o h yd r os t a t ic le a k t e s t.
An in line sewer video camera is used in the process to assist with the placement of test balls throughout the system and to map out the layout of the sanitary sewer system.
Vents and drains shall be closed with a blind flange or a threaded cap plug as provided in the relevant piping class.
Pnf0307 v d 07 hydrostatic test vents and drains welded piping nps 2 and up with pipets and lap joint flanges.
For line size up to 14.
1 for line size 16 and larger.
Pnf0308 v d 08 hydrostatic test vents and drains welded piping nps 3 4 1 1 2 with weld neck flanges.
Pnf0309 v d 09 hydrostatic test vents and drains welded piping nps 2 and up with weldolet and flanges.
Inflatable test balls are inserted into the system through existing cleanouts roof vents and exposed toilet drains to perform a hydrostatic test on an isolated portion of the sewer system.
Verify chloride content of test water when testing stainless steels.
Ensure that equipment such as compressors which must not be included in the field tests have been properly blocked off with the casing drain open.